On the right:
Air-cooled braking dynamometer with the evaluation, display and
control unit swivelling above. In order to meet certain working
conditions, the evaluation, display and control unit can also be
contained in a separate operator's desk.
On the left:
Engine support built up with the
RWB construction kit.
This system is also adaptable to extraordinary testing arrangements
(e.g. for examinations concerning the airborne sound isolation).
In front:
Fuel tank on a precision balance for
automatic gravimetric determination of the specific fuel
consumption.
Further explanations:
MP 140 engine dynamometer
Fuel consumption metering and p-V-diagram
|